Beijing, November 20 (Youth.cn) - Wind power hosts were being installed on a wind power terminal in Dongying, Shandong Province on November 18th. The wind power terminal is located in the middle part of the coast of Bohai sea. With 100km operation radius, the effective coverage will be whole region of the middle part of Bohai sea, while with 300km operation radius, the effective coverage can reach the south part and north part of the peninsula. The site selection is appropriate. The annual cargo handling capacity can reach 650,000 tons. 150 sets of wind power equipment can set out at the same time. The installation of the wind power hosts will strongly support, in the infrastructure manner, the development of wind power industry - the transportation cost of wind turbine generators will be reduced and the delivery time will be assured. These years, Dongying economic and technical development zone pays great efforts to build offshore wind power equipment industrial park - from raw material to components, from equipment testing to equipment transportation, a wind power industrial chain is formed, with the characteristics of big scale, long value chain and complete infrastructure. The construction of wind power equipment industry base is accelerated. Photo/VCG